Nswitchgear testing procedure pdf

Tests on auxiliary and control circuits iec 62271100 7. Technical specification for startup and commissioning of. The measurement of contact resistance in breakers, busbars joints and critical connections is another common procedure in switchgear testing. The megger test is a method of testing making use of an insulation tester resistance meter that will help to verify the condition of electrical insulation. List of functional tests required for electrical systems. Substations and switchgear inherently operate at high voltages. A detailed description of construction requirements. Relay testing secondary current injection test set ges. Transformer bushing cts should be tested using the current. Commissioning tests for hv underground cables up to 33kv swp page 5 of standard work practice sp0407 ver 16 ergon energy corporation limited abn 50 087 646 062 this test is required for xlpe and paper lead cables.

Demonstrate the components of different voltage switchgear demonstrate the maintenance, testing procedures used for different voltage switchgear apply the safety precautions of p. This testing and commissioning procedure is solely compiled for use on emergency generator installation in government buildings of the hong kong special administrative region. Typical factory test procedures for medium voltage products. Switchgear devices are constantly subjected to external influences such as dirt, humidity and temperature fluctuations. Thus, our products present no risk of sf6 leakage, require no quarterly recordkeeping and reporting, and are safe for the environment and human health. Power frequency withstand test voltages rated maximum voltage kv powerfrequency. Typical factory test procedures for medium voltage products 3.

This section specifies the furnishing, installation, connection and testing of the medium voltage switchgear. This testing and commissioning procedure is ed and all rights including subsequent amendment are reserved. Over the years testing and commissioning procedures have become more advanced and these continue to develop today, guaranteeing optimum performance of an installation and the competence and safety of those persons responsible for the operation of hv and lv systems. An improved bonferroni procedure for multiple tests of significance. The complete guide to electrical insulation testing. Guidance and standard operating procedure covid19 virus testing. For this reason they are required to be extremely reliable. Properly planned component testing in coordination with scheduled maintenance ensures electrical protective devices operate as designed when a power anomaly occurs. Standard for testing specifications electrical power. Relay testing service relay injection test set manufacturer.

Current limiting reactors in power system and their arrangement calculation of fault mva for symmetrical short circuits. Power frequency withstand test voltages rated maximum voltage kv powerfrequency withstand rms kv 4. This method statement covers the testing of lv cables. The procedure for system functional testing exceeds far beyond the scope of this document.

The megger insulation tester is essentially a highrange resistance meter ohmmeter with a builtin directcurrent generator. System function tests should be performed in accordance with ansinetaats section 8 during initial switchgear switchboard acceptance. Inspection, testing and commissioning of electrical. Sheet steel fabrication comprising of shearing, bending, punching, arc welding and plasma cutting. Inspection, test and measurement procedures for lv and mv. Where, v t is test voltage, v r is rated voltage of test unit, w m is maximum allowable power loss, w a is actual power loss. Electrical switchboard switchgear testing and commissioning manual from 3. Laboratory testing for coronavirus disease world health organization. Conduct electrical tests on circuit breakers in accordance with ansineta section 7. Lv panel testing procedure in new 2017lv switchgear testing lv switchgear panel.

Factory acceptance tests fat the routine tests shall be made with each electrical equipment and, whenever practicable. The sets are portable, light in weight, yet having all the technical features for testing relays and contractors. All testing required prior to rotating the generating unit under power hydraulic or electrical which is unique to the unit and not associated with system testing. There are several types of voltage testers on the market. Calibration and testing of cts bimetals relays, protection relays etc.

It must be clear that the tests to be conducted as part of promotion project are mainly dc current interruption tests. Instructions for installation, operation, and maintenance. New methods for switchgear test ing and analysis highvoltage switchgear equipment is located at the nodes of electrical power supply systems. The 2011 standard for maintenance testing specifications for electrical power equipment and systems is the most. Voltage drop testing is commonly done to check wires, connectors, and connections for excessive resistance. They can be operated and controlled by means of the builtin control panel equipped with a highresolution, resistive 7 touch screen and two function keys. The test procedure described are applicable to metal clad switchboards. These instructions do not cover voltage and currentsource setup, because there are many ways to provide test current and voltage for a primary injection test. Ac metalenclosed switchgear and controlgear for rated voltages above 1kv and up to and including 52kv 3. This standard provides information essential to designing and testing of metalclad switchgear. The training is mostly hands on testing that will be helpful in all aspects of the electrical industry. Download method statement for mv lv switchgear panel testing. Inspect anchorage, alignment, grounding, and required area clearances. Thus, implementing an effective switchgear testing, inspection, and maintenance program is essential.

Inspect physical, electrical, and mechanical condition including evidence of moisture or corona. Introduction the procedures stated in this document cover the activities in preliminary tests and inspections, functional performance tests and the commissioning of newly completed installations and existing ones after major alteration. System function test for switchgear and switchboards. Innovative switchgears products offer the following. The primary injections test sets are of 15 minutes on30 minutes off duty i. Paint finishing complete with pretreatment, rust proofing and final finishing in epoxy or enamel. When testing medium voltage the three point test should be adopted, test the tester on a known live source or a test box supplied by the manufacturer, test all three phases and retest the tester. Standard for acceptance testing specifications for. The be3200 is a high speed test sequencer for switchgear applications. For additional safety information and safeuse practices for your vcpw circuit breaker, refer to ib1006en table 1. Maintenance testing we recommend and provide includes the following and more.

Normally, the voltage drop on the power feed side and ground side wires, connectors, and connections should not exceed 0. Where applicable, testing of circuit breakers generally include. Most of the times it is necessary to hire a third party in order to conduct the function testing. All outputs and inputs of the be3200 are fiber optically isolated. Every electrician should be familiar with the operation of meggers and hipots. Dc overvoltage test to ascertain suitability of plant for energisation. Testing and commissioning requirements for switchgear. First, the equations of the mathematical model are provided. These methods involve measuring successive insulation resistance. Simes 1986 has proposed a modified bonferroni procedure for the test of an overall hypothesis which is the combination of n individual. Megger guide to electrical insulation testing pdf instrumart. Electrical functional testing is very important and critical part of any electrical project. Voltage drop testing is important because high resistance can prevent proper circuit operation. If you are interested in full list of method statement for electrical testing and commissioning please.

Mostly primary injection test set are designed as per customers specification. Although the test voltage is calculated from above formula but the test voltage should be limited up to that value which produces maximum 144 % of rated kvar of the capacitor unit. In 2005, this document was approved for the first time as an american national standard. Safety for operators, staff and visitors in front of the existing. Electrical switchboard switchgear testing and commissioning. The megger insulation tester is a small, portable instrument that gives you a direct reading of insulation resistance in ohms or megohms. Medium voltage operation mv drives and soft starters are temporarily installed in the mv test bay and operated on an mv dynamometer. Learning objectives understanding the hipot test hipot test requirements hipot test considerations and failures arc detection. What is the procedure for inspection and preventive maintenance and testing of circuit breakers. The dc voltage scale on your digital volt ohm meter dvom or digital multimeter can be used to measure the voltage drop across a load, device or conductor. S horted the cts secondary to ground and isolat ed from relays and m eters. Testing and commissioning of mvhv cables example of asbestos paper insulation wrap on highvoltage cable inside an underground cable vault.

Damage to the switchgear itself can be extremely expensive, but that pales in comparison to corollary damage and the potential hazards to people. Duri ng normal h v test s on sw itchgear or gi s, the cts are inc luded in the h v test. Actas p260 and p360 are flexible and compact test systems for testing high and mediumvoltage switchgear devices. The established documentation for the elimination and control of hazards is henceforth referred to as electrical safety procedure. Calibration testing primary injection test sets ges. Most importantly all measuring tools must have valid calibration certificate at the time of switchgear testing and commissioning of switchgear. National switchgear carries a variety of tools to help make your electrical equipment maintenance tasks easier from oems like cutlerhammer, westinghouse, eaton, general electric ge, bbc, ite, abb, siemens, allischalmers and square d and more. Ieee 1248 guide for the commissioning of electrical systems. The hipot test the dielectric voltagewithstand test is commonly known as the hipot test. Inspection and test plan reference document acceptance criteria verifying document 1. Some tests and procedures may be performed by specialists during the. It mainly provides advanced highvoltage test equipment and testing instruments for power generation, substation, power supply, power consumption departments, scientific research institutions and power equipment related production and service enterprises in the power industry. Lv panel testing procedure in new 2017lv switchgear.

The design and engineering department is well equipped with computer aided design cad systems and drafting facilities for accurate and quick preparation of design and execution. To replace sf6 with air in testing with proper consideration of the differences this paper focuses on calculations of the pressure rise as result of an internal arc fault. The main focus of the test procedure are the following points. Distance 250m 500m m 2000m cable size m 11kv or less 400mm2 250 125 60 30 185 240mm2 300 150 75 37. Since 1989, revised editions of the maintenance testing specifications have been published in 1993, 1997, and 2001. Voltage drop testing is a simple but effective method of diagnosis to quickly locate highresistance problems in a circuit. To verify the physical condition and proper connections of bus bar. The supply and primary switchgear for a large electrical installation.

Applicable to tata power operating and project sites which cover but not limited to plant premises, switchyards, substations, offices. Switchgear and switchboard inspection and testing guide. Testing and maintenance of protective gear, protection against surgesurge absorber, surgediverter. When switchgear malfunctions, the consequences are often catastrophic. Section 7 of the ansineta standard for acceptance testing specifications for electrical power equipment and systems may be reproduced and used on a cut and paste basis for the particular type of equipment to be tested. Improve the quality control of the project and simplify the procedures for engineers. Insulation resistance quality of an electrical system degrades with time, environment condition i.

Included herein are preferred ratings, required design test procedures, and acceptance criteria. Carry out 500v megger test for phase to earth, neutral to earth, phase to neutral and phase to phase to measure the insulation resistance with all breakers in on positions all reading will be recorded in qc06 quality assurance test report megger. Circuit breakers should be tested periodically to ensure operability and protection resolution. Study and testing of thermal overload relay for induction motor protection 1823 5. Page 6 page 7 arc door existing switchboards have no internal arc withstand, human presence in front of the live switchboard is unavoidable. Manufacturing process the international electrical products. The test shall be carried out on a complete switchgear including its control and auxiliary circuits. Switchgear, transformers, cables, overhead lines, surge arresters, voltage transformers, current transformers, unit substations. What is the procedure for inspection and preventive. Switchgear testing requires a device for accurate sequence and timing control. Our products contain no sf6 gas which is the number one greenhouse gas, and which degrades into highly toxic byproducts. While doing the hv test the steps to be followed are.

Ul 1558 standard for metalenclosed lowvoltage power. However, in this document a general test procedure is presented. Insulation resistance testing guide chauvin arnoux. This may be the only opertunity you will ever have to dismantle a 1200 amp breaker for an inside look. Testing of high voltage cables manual horizon power 1st edition february 20 prepared by field practices. This article covers testing and startup commisioning procedures for all the components of medium voltage switchgear like circuit breaker, busbars, instrument transformers currentvoltage, disconnect and grounding switches etc 1. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients.

Nfpa standard 70e provides additional specific guidance on procedures and the level of personal protective equip. Low voltage switchgear service installation and commissioning. Lv panel testing procedure in new 2017lv switchgear testinglv switchgear panel edison world. Functional test is to be done according to the drawings given. High voltage test is done by applying 80% of factorytested voltage. A stagewise rejective multiple test procedure based on a modified. The following sections of the ansineta standard for acceptance testing specifications for. Protective relay testing may be divided into three categories. All workers to comply the safety requirements such as safety shoes, safety helmet, safety glasses, fluorescent vest, and safety gloves to ensure maximum ability of safe work. Our switchgear and enclosures are made of welded 304 stainless. Electrical switchgear safety a guide for owners and users this is a webfriendly version of leaflet indg372rev1, published 04 introduction this guidance is for owners and operators of electrical switchgear in industrial and commercial organisations with little electrical knowledge or expertise available inhouse. Manufacturer of relay testing service relay injection test set offered by ges switchgear private limited, chennai, tamil nadu.

For good insulation, the resistance usually reads in the megohm range. Procedure h r a 7 switchgear mechanical operation test procedure iec, nec, nema, fdf, iso ansi, ci, ipcea iec, nec, nema, fdf, iso ansi, ci, ipcea procedure h r a inspection and test plan for switchgear before manufacturing materials activity by no. Primary injection test an intellirupter pulsecloser fault interrupter primary injection test is used to verify configured settings, time current characteristics, and test sequences. In this article i go to share the actual what we do in after panel switchgear installation and what are the procedure of switchgear testing and commissioning. Testing of high voltage cables manual horizon power. Oct 28, 2016 the procedure for the inspectiontesting of circuit breakers and switches is beyond the scope of this guide as each type and voltage class has its own procedure. Testing manual for electrical equipment requirements are fulfilled. Then, two applications of the simplified model are discussed. Our new prime microohmmeter combines both static and dynamic resistance measurements, as it is essential for assessing the actual condition of the contacts in inaccessible sf or vacuum chambers. Testing and commissioning procedure for electrical installation 1. Device testing should be completed using uptodate industry processes and testing equipment. Several layers of the soft and friable insulation are wrapped around the cable in long, wide strips. Which of the procedures described below are added to your test plan will depend on the specific project or industry specifications, to be.

Inspection, test and measurement procedures for lv and mv up to 36kv switchgears on photo eaton cutler hammer magnum ds switchgear inspection, and transformer testing for mv switchgear similar considerations apply although more extensive checks on protective devices, circuit breaker oil, vacuum bottle contact distances are required as. Arrangement of bus bar, circuit breaker and isolator. Megger low resistance testing guide pdf instrumart. Square d sqd full function secondary injection test set new. Operation testing of the generating unit from initialpowered rotation to verify suitability for operation. Ac power frequency overvoltage test to ascertain suitability of plant for energisation.